Bassetlaw and District Cricket League Official Handbook 2013

96 When such interruption prevents a minimum of 10 overs being bowled by the scheduled time for the cessation of the second innings, the hours of play shall, subject to the prevailing ground, weather or light conditions, be extended until 10 overs have been bowled. (ii) If a match is interrupted during the second innings, and unless a result is achieved earlier, the innings shall end 1 hour 15 minutes after the start of the innings, or on completion of the over in progress at that time. When such interruption prevents a minimum of 10 overs being bowled in the second innings by the scheduled time for the cessation of the second innings, the hours of play shall, subject to the prevailing ground, weather or light conditions, be extended until 10 overs have been bowled, or a result has been achieved. (iii) The calculation of the adjusted number of overs and the time remaining is calculated using the following formulas: Overs Remaining = [A] – Overs already bowled Time Remaining = [B] – Time on field of play Using the following table as guidance: Time lost (minutes) Overs Lost Total Overs (new allocation) [A] Time allowed (length of innings) [B] 0 3.5 0 1 19 1h 12m 0 7 .0 0 2 18 1h 08m 10.5 0 3 17 1h 05m 14 .0 0 4 16 1h 01m 17.5 0 5 15 0h 58m 21 .0 0 6 14 0h 54m 24.5 0 7 13 0h 51m 28 .0 0 8 12 0h 47m 31.5 0 9 11 0h 44m 35-45 10 10 0h 40m 90+ Match Abandoned – No Result Competition Rule 8.2(iv) will apply. (iv) Should it be deemed that there is no longer the opportunity for the side batting second to face the minimum of 10 overs required in order of achieving a result, the match should be abandoned. On Finals Day, Competition Rule 8.5(vi) will apply.

RkJQdWJsaXNoZXIy NDg4Mzg=